Inside the Twister Locked and Loaded


I’m still trying to catch up from teaching all last weekend, but in between embroidering quilt labels, etc. I loaded Inside the Twister on the quilt frame. So I would quilt a row, then run to the embroidery room and check on the embroidery machine. Status: Inside the twister is quilted, waiting for binding, 3 quilt labels are done and half way through a job for my friend Jennifer.

Tomorrow I’m off to teach the Lemoyne star class at Sew E-Z in Portsmouth.

2 thoughts on “Inside the Twister Locked and Loaded

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s